Control panels, telemetry & PLC’s
The Client:
A national Defence contractor
The Challenge:
Having been let down by another contractor, the client asked REM Pumping to produce a treatment plant to deal with explosive residues.
The Solution:
After being presented with a control philosophy on a single sheet of A4 paper (which we subsequently revised into a 92-page document) we designed, built and installed the complete treatment plant.
REM Pumping have now been engaged to carry out routine servicing & maintenance at this Glasgow site!